Eagles Nest (VR12)

Foto 3-8-23, 8 54 31 a.m.
  • Framed from foundation up.
  • Siding was installed.
  • Cedar shakes were installed on gables.
  • Decks were framed on the lower, main level, and main entrance.
  • Windows and doors were installed.
  • Timber frames were installed on the front and back deck, as well as on the gables for adornment.
  • The garage was framed with access to the attic through the outside on the back of the garage, with a stairwell leading up to a small deck for the entrance.