Cliffs Edge (C47)

  • Framed from the foundation up.
  • Framed an 18’ knee wall to the elevation of the first floor.
  • Decks were installed as the framing went up.
  • Framed garage with a small attic and a hallway connecting with the house.
  • Windows and exterior doors were installed.
  • Siding and trim were installed.
  • Timber frames were installed on the front and back of the house, as well as the gables for adornments.