Great Vista (S38) Framed from the foundation up Decks installed as framing went up Windows and exterior doors were installed Siding installed Timber frames were installed on the front and back of the house, as well as the gables for adornments. Skills Posted on April 4, 2024 ← Wilder Woods (C82) Ridge Stone (S55) →